An FCM-Based Dynamic Modelling of Integrated Project Delivery Implementation Challenges in Construction Projects

Autoři

KAHVANDI Zahra SAGHATFOROUSH Ehsan ZARERAVASAN Ahad MANSOURI Taha

Rok publikování 2018
Druh Článek v odborném periodiku
Časopis / Zdroj Lean Construction Journal
Fakulta / Pracoviště MU

Ekonomicko-správní fakulta

Citace
www http://lean-construction-gcs.storage.googleapis.com/wp-content/uploads/2022/08/08160559/LCJ_18_004.pdf
Klíčová slova Integrated Project Delivery (IPD); Fuzzy Cognitive Map (FCM); Challenges; Construction Projects; Dynamic Modelling
Přiložené soubory
Popis Question: What are the Integrated Project Delivery Implementation challenges in construction projects, their interrelationships and their effects on the project time, cost and quality?Purpose: The Purpose of this study is applying an efficient method to determine the most important challenges to IPD implementation in construction industry, and also to evaluate the interrelationships among these challenges and their effects on the project time, cost, and quality.Research Method: This study models available Integrated Project Delivery challengesusing a real case data, through applying Fuzzy Cognitive Mapping technique.Findings: Results show that contractual factors have the major influence compared with others. This shows the significance of paying attention to why project stakeholders must be integrated throughout the project life cycle since early contract documentation stage.Limitations/Implications: This study is limited to the caseselectedfrom Tehran of Iran.Value for authors: This study is significantdue to identifying, classifying and determining the intensity of effects of IPD implementation challenges on cost, time, and quality of construction projects. It results in planning, resolving the challenges, enhancing the quality of constructions and lastly saving the construction cost and time.